Public lighting

From MyWiki
Revision as of 13:21, 30 January 2018 by Antonio (talk | contribs)
Jump to: navigation, search

To be removed

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.


This section is structured into:





Croatia

Practice:

Installation of two solar-benches at the Marjan hill area in the city of Split

Location:

Marjan hill in the city of Split, Croatia

Description:

Installed smart benches are energy independent, because they use power from solar panels. All the processes are controlled with two processors that are built-in within the bench. The solar bench is resistant to shocks and can work 10 days without the sun. Carriage capacity of the bench is 300 kilograms and can hold up to four people. Each bench has four USB ports for cell phones and tablets, night lightning, CO2 control, air temperature display, 60 watts power, and can produce 1 kW of electricity daily.

Image

PublicLighting 01 SolarBenchesMarjanHill 1.jpg PublicLighting 01 SolarBenchesMarjanHill 2.jpg

Link:

http://www.marjan-parksuma.hr/






Slovenia

Practice:

Energy Rehabilitation of Public Lighting at Municipality of Komen

Location:

Municipality of Komen, Slovenia

Description:

Energy consumption in Komen municipality for public lighting was 110,52 kWh/year per capita. In the project, 677 lights were replaced. The public lightning was not in conformity with the Decree on limit values, due to light pollution of environment (it was mostly inappropriate and incorrectly installed). The municipality, which is also the investor and equipment owner, obtained non-refundable funds through the public call E3URE. The concessionaire/contractor (an ESCO company) has paid to compensate (municipality) an abstraction fee in one off payment, at take over process of managing of public lighting. Concession duration is 15 years.

Image

PublicLighting 02 MunicipalityofKomen 1.jpg

Link:

http://www.primorske.si/Novice/Srednja/Luci-bodo-varcnejse






Poland

Practice:

Construction and modernization of street lighting

Location:

City of Bydgoszcz, Poland

Description:

Improving Public Lighting System through the use of energy-efficient solutions (replacing the old light sources for energy – LED). In the city there were 7 309 units of luminaires and lighting cabinets exchanged and installed for lighting control system, that is reducing energy consumption.

Image

PublicLighting 03 StreetLightingBydgoszcz 1.jpg

Link:

http://www.zdmikp.bydgoszcz.pl